Canada's warmest welcome ®* October 24 2020

Highway 3 Resurfacing Project September 23 to November 6

osoyoos, canada's warmest welcome

Share page

Text size reduce text size increase text size Share page Facebook Twitter LinkedIn

RESCHEDULED Large (Bulky) Items Curbside Garbage Collection

Art Gallery Summer Artisan Market Extended Through September 19

The Osoyoos Art Gallery Presents The Okanagan and Beyond

International Osoyoos Lake Board of Control Virtual Public Meeting October 8

9th Annual United Way Drive Thru Breakfast October 8

Art Gallery Creativity In Our Community Application Deadline Nov 21

Osoyoos Credit Union Trick or Treat Main Street Virtual Edition

Highway 3 Resurfacing Project September 23 to November 6

Highway 3 Paving operations between Junction of Highways 3 and 97 and Chapman Road (13.37 km).

Monday to Saturday, 7 am to 7 pm, from September 23 to November 6, 2020.

  • 70 km/hr construction speed zone is in affect for Osoyoos Hill.
  • Watch for milled surfaces and letdowns.
  • Watch for crew and equipment on the road.
  • Single alternating traffic.
  • Obey traffic control and construction speed limits.

See DriveBC for up to date information.

(T)  1.866.222.4204

Event date: 
Friday, 06 November, 2020
News item
While every reasonable effort is made to ensure the accuracy of this data, we are not responsible for any errors or omissions contained on these pages. Please verify any information in question with the Town of Osoyoos.   Town of Osoyoos
Box 3010, 8707 Main Street
Osoyoos, BC V0H 1V0
(TF) 1.888.495.6515
(T) 250.495.6515
(F) 250.495.2400
(E) info@osoyoos.ca

 

Mission Statement
To provide quality community services and facilities, which meet the needs of the current
and future residents of Osoyoos, in a socially, economically and environmentally sustainable manner.

Copyright © 2013 Town of Osoyoos All Rights Reserved. Powered by CivicWeb CMS - Copyright © 2013 iCompass Technologies Inc.